Excavation of contaminated soil and water took way longer than expected and the project is likely well over budget. They did, however, put a sign up a few months ago that says coming soon summer 2017 where I assume the main entrance to the point will be. The construction has been pretty non stop and the soil excavation site appears capped. That green blue glowing pool at the south end of the Driscoll bridge is no more. That was majorly poisonous. Once the foundation is poured it should be pretty quick to get the store built.